Bob Burdick

Treasurer

Field Manager/Safety Director

Bob joined the Absolute Construction team in 2004 entering immediately into his current executive position helping to expand the business interest into Construction Management serves. 

During his over 30 years of experience Bob has developed a knowledge of construction from the trenches to close-out through his direct hands on technical exposure.  Bob’s responsibilities at ACE include:

  • Owner/Architect relations
  • Project Management
  • Scheduling Activities
  • Quality Control
  • Project Safety Manager
  • Monitoring Project Cost    
  • Expediting
  • Trade contractor’s daily performance evaluations

Experience

Bob has been supervising projects since becoming a journeyman and during the past 18 years he has continually performed as a Field Manager, combining supervisory and managerial responsibilities, on several major construction management projects. He utilized this direct technical experience to the benefit of projects both during the planning/design phase as well as following through to direct the actual construction. Bob is extremely detail oriented, thoroughly enjoys driving each project to success, dealing with its challenges, and producing a quality project.  Bob has a record of total owner satisfaction.

Education/Training

  • Four Year Carpentry Apprenticeship
  • AGC OSHA Safety Training
  • AGC Supervisory Training (two-year program) 
  • Lead Safe Contractor Certified
  • Red Cross Certifications
  • High Security clearance

Project References

Antioch Community Schools
Antioch, IL

54,000 square foot addition to existing upper grade school during occupied school year and renovation to 26,100 sf of existing school.  59,000 square foot addition and 26,100 sf renovation to High School Campus as well as 15,000 sf field house and additional 27,000 sf of renovation to existing campus with conversion of existing steam system to new boilers.

Midwest Urgent Care
Kenosha, WI

Field manager of 29,000 square foot medical urgent care facility designed and built in seven months.